Steele Creek Park’s Lake Is Being Lowered For A Stabilization Project Over The Next Several Weeks. This Will Include Installing A Timber Wall Along The Old Beach Area To Stop Erosion. The Lake Will Be Lowered Six To Ten Inches During The Project. The Project Is Expected To Last Three To Four Weeks.